01
Coral Board System
02
Passive Fire Protection Systems for Buildings
03
Prefabricated Component System
04
MIC Prefabricated Component System
ABA Quick Installation Decorative Wall Panel
ABA Quick Installation Decorative Wall Panel
ABA Quick Installation Decorative Wall Panel
ABA Quick Installation Decorative Wall Panel

PRODUCT

PERFORMANCE

Fire safety

Using A1 grade non combustible substrate, with a fire resistance limit of up to 4 hours, meeting the highest fire prevention standards in public places;

安必安新国标GB木质防火一体门芯

High strength impact resistance

The impact resistance performance reaches 16KJ/m ², the flexural strength is greater than 10MPa, and the single point hanging force is excellent, ensuring that the wall is sturdy and durable;

安必安新国标GB木质防火一体门芯

Environmental Protection and Health

The substrate is free of formaldehyde (ENF grade) and has a smoke toxicity level of AQ1, meeting the strict environmental requirements of medical, educational, and other places;

安必安新国标GB木质防火一体门芯

Durable finish

SPC veneer is wear-resistant at 550 revolutions per minute, resistant to scratches ≥ 3H, resistant to high temperatures of 180 ℃, resistant to stains (coffee, oil stains, etc.), and will not fade after long-term use;

安必安新国标GB木质防火一体门芯

Efficient installation

Dry keel hanging operation, free of water and dust, with an 80% increase in efficiency compared to traditional wet methods, reducing material waste and overall costs;

安必安新国标GB木质防火一体门芯

Waterproof and soundproof

Water absorption rate ≤ 0.5%, softening coefficient ≥ 0.85, sound insulation>30dB, suitable for humid environments and high noise reduction scenarios.

安必安新国标GB木质防火一体门芯

PRODUCT

SPECIFICATION

ProductModelProduct RenderingStandard sizeFinishingWeight (kg/㎡)
Coral decorative panel10600

安必安快装饰面墙板

安必安快装饰面墙板

2950*700*11mmCoral SPC Decorative Panel - B17.5
108502950*700*11mmCoral SPC Decorative Panel - B110
HPL decorative panel - A2
158502950*700*16mmCoral SPC Decorative Panel - B114

INSTALLATION

INSTRUCTIONS

Horizontal bullet line punching  →  Install support components →
Horizontal bullet line punching  →  Install support components  →
Apply 3m adhesive tape  →            Install aluminum fasteners  →  
Apply 3m adhesive tape  →            Install aluminum fasteners  →  
Wall panel groove insertion initial aluminum fasteners and supporting aluminum fasteners →
Wall panel groove insertion initial aluminum fasteners and supporting aluminum fasteners →
Insert aluminum fasteners vertically into the wall panel and fix them up and down →
Insert aluminum fasteners vertically into the wall panel and fix them up and down →
Install finished skirting board
Install finished skirting board

INSTALLATION

CONDITION

1. Grassroots requirements

Wall flatness: The base wall surface needs to be flat, with a flatness error of ≤ 3mm/2m, to ensure the stable installation of the keel dry hanging system

Structural strength: The base wall should have sufficient bearing capacity, the concrete wall strength should be ≥ C20, and the lightweight partition wall needs special reinforcement treatment


2. Environmental conditions

Temperature range: 5 ℃~40 ℃ (for temperatures below 5 ℃, special low-temperature fasteners are required)

Ventilation requirements: The installation area should be kept ventilated to avoid the accumulation of adhesive volatiles

Lighting conditions: Avoid direct sunlight on the work surface (SPC decorative pre installed protective film)


4. Installation specifications

Joint treatment: Reserve 3-5mm expansion joints between boards and fill them with specialized elastic rubber strips

Fixed requirement: no less than 8 dedicated anchors per square meter, with encrypted edges


5. Storage and transportation

Board storage: horizontally placed in a dry environment, with a stack height of ≤ 1.2m and SPC facing upwards

Handling requirements: Vertical transportation, avoiding bending, and the decorative surface needs to be fully covered with protective film


Note: The entire process is dry operated, and the joint closure can be carried out immediately after installation without a maintenance period. Before large-scale construction, it is necessary to conduct a sample wall inspection.