Environmental requirements
1. The construction site should be kept dry and tidy, and the ground should be flat and stable to ensure the verticality and stability of the partition wall installation.
2. The installation environment temperature should be between 5 ° C-40 ° C to avoid construction under extreme high temperature conditions.
Basic conditions
1. The partition wall should be installed on the base layer that meets the load requirements of the building structure, such as concrete floor slabs, steel structures, etc., to ensure that the bearing capacity meets the design requirements.
2. If it involves the pre embedding of pipelines or the installation of fire doors, it is necessary to coordinate with relevant teams (such as fire protection, water and electricity) in advance to ensure compliance with national fire safety regulations.
Environmental adaptability
It is recommended to use dry methods during construction to reduce on-site pollution and improve installation efficiency.
Storage and Handling
1. Materials should be stored away from rain and direct sunlight, and kept ventilated and dry to prevent deformation or damage to performance.
2. During the transportation process, handle with care to avoid severe collisions and ensure the integrity of the panel and keel structure.
The ABA partition wall system adopts modular design, which is easy to install, but it still needs to strictly follow construction specifications to ensure optimal performance and safety.