01
Coral Board System
02
Passive Fire Protection Systems for Buildings
03
Prefabricated Component System
04
MIC Prefabricated Component System
S series split partition wall
S series split partition wall
S (Standrad Basic Edition) series
S (Standrad Basic Edition) series

PRODUCT

PERFORMANCE

Fire safety

The fire rating reaches A1 non combustible level, with a fire resistance limit of 4 hours, meeting the fire protection requirements of various types of buildings.

安必安新国标GB木质防火一体门芯

High strength load-bearing capacity

A single self tapping nail can vertically suspend a heavy object weighing up to 45kg.

安必安新国标GB木质防火一体门芯

Impact resistance

Through the use of multi-element magnesium based gel foaming technology, it can withstand 100 impacts from 30kg sandbags and is sturdy and durable.

安必安新国标GB木质防火一体门芯

Waterproof and moisture-proof

Adopting Ankong board surface layer, the partition wall has no issues of moisture absorption, loosening, halogen return or deformation, and is suitable for humid environments.

安必安新国标GB木质防火一体门芯

Environmental Protection and Health

The material is free of formaldehyde and harmful volatiles, reaching ENF formaldehyde free level, and producing smoke toxicity AQ1 level, safe and harmless.

安必安新国标GB木质防火一体门芯

Easy installation

Dry process operation, modular assembly, fast construction speed, high compatibility of finishes, and can be directly decorated.

安必安新国标GB木质防火一体门芯

PRODUCT

SPECIFICATION

ProductSize(mm)RenderingStructureSoundproofFire resistance limitWeight(kg/㎡)Finishing
85S split partition wall (unable to prefabricate pipelines)2400-2950*167*85S系列分拆式隔墙15850 Coral panel (backed Coral keel) * 2+SPC/HPL decorative panel * 240dB+1.5h37

SPC decorative panel (B1)

/HPL decorative panel (A2)

110S split partition wall (thinnest model for prefabricated pipelines)

2400-2950*167*11042dB+1.5h37
150S split partition wall2400-2950*167*15045dB+1.5h38
200S split partition wall2400-2950*167*20048dB+1.5h39

INSTALLATION

INSTRUCTIONS

Initial installation
Initial installation
Installation at vertical connections
Installation at vertical connections
Final installation
Final installation
Final installation
Final installation
Bottom installation
Bottom installation
End walls and windows
End walls and windows

INSTALLATION

CONDITION

Environmental requirements

1. The construction site should be kept dry and tidy, and the ground should be flat and stable to ensure the verticality and stability of the partition wall installation.

2. The installation environment temperature should be between 5 ° C-40 ° C to avoid construction under extreme high temperature conditions.


Basic conditions

1. The partition wall should be installed on the base layer that meets the load requirements of the building structure, such as concrete floor slabs, steel structures, etc., to ensure that the bearing capacity meets the design requirements.

2. If it involves the pre embedding of pipelines or the installation of fire doors, it is necessary to coordinate with relevant teams (such as fire protection, water and electricity) in advance to ensure compliance with national fire safety regulations.


Environmental adaptability

It is recommended to use dry methods during construction to reduce on-site pollution and improve installation efficiency.


Storage and Handling

1. Materials should be stored away from rain and direct sunlight, and kept ventilated and dry to prevent deformation or damage to performance.

2. During the transportation process, handle with care to avoid severe collisions and ensure the integrity of the panel and keel structure.


The ABA partition wall system adopts modular design, which is easy to install, but it still needs to strictly follow construction specifications to ensure optimal performance and safety.