01
Coral Board System
02
Passive Fire Protection Systems for Buildings
03
Prefabricated Component System
04
MIC Prefabricated Component System
50 integrated partition wall
50 integrated partition wall
50 integrated partition wall
50 integrated partition wall
60 integrated partition wall
60 integrated partition wall

PRODUCT

PERFORMANCE

Fire safety

The fire protection level reaches A1 non combustible level, and has passed national authoritative testing to meet the strict fire protection requirements of various types of buildings;

安必安新国标GB木质防火一体门芯

High strength load-bearing capacity

A single self tapping nail can vertically hang heavy objects up to 45kg;

安必安新国标GB木质防火一体门芯

Impact resistance

Adopting multi-element magnesium based gel foaming technology, it can withstand 50 impacts of 30kg sandbags, with a sturdy and durable structure;

安必安新国标GB木质防火一体门芯

Environmental Protection and Health

The substrate is independently developed Ankong board, without formaldehyde addition, reaching ENF formaldehyde free level and smoke toxicity AQ1 level;

安必安新国标GB木质防火一体门芯

Efficient installation

Adopting dry operation and modular design, on-site assembly is fast and convenient, greatly reducing the construction period;

安必安新国标GB木质防火一体门芯

Beautiful finish

SPC veneer is wear-resistant and scratch resistant, providing a variety of color options to meet the decorative style needs of different spaces.

安必安新国标GB木质防火一体门芯

PRODUCT

SPECIFICATION

ProductSize(mm)RenderingStructureSoundproofFire resistance limitWeight(kg/㎡)Finishing
50 integrated partition wall2400-3500*600*5050/60一体式隔墙

Coral 850 keel+

Coral 400 Wall Core+

SPC decorative panel * 2


35dB+1.5h25

SPC finishing

 (<B1)

2400-3500*950*50

60 integrated partition wall

(Pre embedded pipeline)

2400-3500*600*6037dB+1.5h29
2400-3500*950*60

INSTALLATION

INSTRUCTIONS

Initial installation
Initial installation
Installation at vertical connections
Installation at vertical connections
Final installation
Final installation
Top installation
Top installation
Bottom installation
Bottom installation

INSTALLATION

CONDITION

Basic conditions

The construction ground should be flat and sturdy, with a horizontal deviation of no more than 3mm/m, to ensure that the partition wall is installed vertically and stably.


Environmental parameters

The construction environment temperature should be maintained within the range of 5 ℃~40 ℃ to avoid extreme high or low temperature operations.


Space requirements

1. The construction area needs to be clean and dry, with no accumulated water, oil stains or other pollutants;

2. Reserve sufficient operating space (recommended ≥ 800mm) for modular assembly and adjustment.


Special restrictions

If it involves fire doors or pre embedded pipelines, it is necessary to coordinate with relevant professional teams in advance to ensure compliance with fire safety regulations.


Storage and Handling

1. When storing materials, they should be protected from rain and direct sunlight, and the stacking height should not exceed 1.5m to prevent deformation;

2. Handle with care during transportation to avoid scratches on the decorative layer (SPC) or damage to the edges and corners of the board.


Tip: The entire construction process adopts dry operation, without the need for wet operation, reducing on-site pollution and improving efficiency.