110S/150s prefabricated bathroom partition wall
110S/150s prefabricated bathroom partition wall
110S/150s prefabricated bathroom partition wall
110S/150s prefabricated bathroom partition wall
150A prefabricated bathroom partition wall
150A prefabricated bathroom partition wall
200A+prefabricated bathroom partition wall
200A+prefabricated bathroom partition wall
Prefabricated bathroom chassis
Prefabricated bathroom chassis

PRODUCT

PERFORMANCE

Integration

Adopting an integrated design of walls and pipelines, traditional complex processes such as masonry, waterproofing, and backfilling are eliminated, greatly improving construction efficiency;

安必安新国标GB木质防火一体门芯

Express setup

Support dry assembly process, 2 people can complete the installation of a 3 ㎡ bathroom in 4 hours, which is 90% more efficient than the traditional 15 day construction period;

安必安新国标GB木质防火一体门芯

Double waterproof and thermal insulation

Innovatively adopting a polyurethane coated SPC/ceramic tile bottom box structure, forming a closed waterproof system to eliminate leakage hazards; Good insulation performance, effectively preventing condensation on the back of the wall panel and preventing mold damage;

安必安新国标GB木质防火一体门芯

High strength substrate

Using 850 density Ankong board as the substrate, it combines lightweight (density 850kg/m ³) and high-strength characteristics to ensure structural stability;

安必安新国标GB木质防火一体门芯

Pipeline integration

Pre embedded pipeline channels on the substrate achieve seamless integration between the water supply and drainage system and the wall, improving space utilization;

安必安新国标GB木质防火一体门芯

Pipeline integration

Pre embedded pipeline channels on the substrate achieve seamless integration between the water supply and drainage system and the wall, improving space utilization;

安必安新国标GB木质防火一体门芯

PRODUCT

SPECIFICATION

ProductSize(mm)RenderingStructureSoundproofFire resistance limit

Weight

(kg/㎡)

FinishingConfiguration Description
110S prefabricated bathroom partition wall2400*600*110安必安装配式卫生间隔墙


12850 ampere open panel

(Backed with Coral keel) * 1+6mm ceramic tile (inside) * 1+15850 Coral panel

(Backlining Coral keel) * 1+SPC/HPL decorative panel (outer) * 1

42dB+1.5h636mm Ceramic Tile (Inner) SPC decorative Panel (Outer) - B1/6mm Ceramic Tile (Inner) HPL decorative Panel (Outer) - A2Configuration Description: S: Standard Configuration A: Acoustic Soundproofing Configuration A+: Acoustic+Super Soundproofing Configuration
150S prefabricated bathroom partition wall2400*600*15045dB+1.5h64
150A prefabricated bathroom partition wall2400*600*150安必安装配式卫生间隔墙


12850 ampere open panel

(Backlining Coral keel) * 1+

6mm ceramic tile (inner) * 1+

15850 ampere open panel

(Backlining Coral keel) * 1+

SPC/HPL decorative panel (outer) * 1+

30mm thick 120k rock wool * 2

50dB+2.0h70
200A+prefabricated bathroom partition wall2400*600*200安必安装配式卫生间隔墙

12850 ampere open panel

(Backlining Coral keel) * 1+

6mm ceramic tile (inner) * 1+

15850 ampere open panel

(Backlining Coral keel) * 1+

SPC/HPL decorative panel (outer) * 1+

50mm thick 150k rock wool * 2+

12mm composite soundproof board (9mm calcium silicate board)+

3mm soundproof felt

12850 ampere open panel

(Backlining Coral keel) * 1+

6mm ceramic tile (inner) * 1+

15850 ampere open panel

(Backlining Coral keel) * 1+

SPC/HPL decorative panel (outer) * 1+

50mm thick 150k rock wool * 2+

12mm composite soundproof board (9mm calcium silicate board)+

3mm soundproof felt

55dB+2.0h82
Prefabricated bathroom chassis70 thickness安必安装配式卫生间隔墙Bathroom chassis//33Ceramic tile


28SPC

INSTALLATION

CONDITION

1. Basic requirements

Ground flatness: The base ground needs to be leveled with a horizontal error of ≤ 3mm/m ² to ensure the sealing of the waterproof chassis

Structural load-bearing capacity: The floor load must be ≥ 150kg/m ² (including equipment and usage loads)

Pipeline pre embedding: The water supply and drainage points should be pre embedded in place according to the design drawings, and the reserved interface elevation error should be ≤ 5mm


2. Environmental conditions

Temperature range: 5 ℃~40 ℃ (low-temperature environment requires the use of low-temperature curing sealant)

Ventilation requirements: Ventilation should be maintained during installation to avoid the accumulation of volatile adhesive gases


3. Space requirements

Installation channel: A handling channel with a width of ≥ 800mm and a floor height of ≥ 2.4m should be reserved

Cleaning of work surface: The base layer is free of dust, oil stains, and accumulated water, and the moisture content of the concrete base layer is ≤ 8%


4. Special Restrictions

Waterproof test: After installation, a 24-hour closed water test (water level ≥ 20mm) is required

Maintenance reservation: Pipe well maintenance port size ≥ 400mm × 400mm


5. Storage and Handling

Stacking of boards: placed horizontally, with a stacking height of ≤ 1.2m, to avoid deformation of SPC veneer under pressure

Waterproof chassis transportation: upright handling, no dragging causing damage to the polyurethane coating


Note: The entire process of dry construction does not require a maintenance period, and the finishing treatment can be carried out immediately after installation.